The weather has been very wet which slows down construction but we have been able to keep moving forward. As you can see from this picture, we have shaped out two new bunkers and added drainage. Drainage work is also progressing for the green. Today, if it does not rain, we will finish drainage on the two green side bunkers, add top soil to the surrounds and have 50% of the green drainage done.